The purpose of this Final Project is to solve the problem of the delay in the implementation of the New 12 Floors Building Project Phase I of the Administration Faculty, Universitas Brawijaya Malang by determining the types of work that can be accelerated, determining the number and types of labor, and handling costs for acceleration. It also can set the planned implementation time precisely. …
This study was made with the aim of examining the effect of the variable Operating Costs and Operating Income (BOPO), Loan to Deposit Ratio (LDR), and Non Performing Loans (NPL) on Net Interest Margin (NIM). The sampling technique used was purposive sampling, which is based on the criteria for national foreign exchange private commercial banks that have gone public in the 2018-2019 period. The …