CD-ROM
Analisis dan perencanaan biaya produksi pada perusahaan paving stone CV. Indah Cemerlang (CD)
In stone paving industrialist, part production is part that maximal to enter into cost. Ti think of important part production cost, side management need to creat mechanism system outline and determination cost production with to be able to break skill that accurate and relevan use to reach for purpose industrialist.
To be method that used for analysis problem is to decide cost price production with method actual costing, selling price to be determined pursuant to profit range from result of research. from cost price proction, influence at profit, cash flow, BEP. This method used to decided cost price production with to check. With survey selling price continued with selling price, that will to check with not influence to profit, cash flow and BEP.
Besed analysis product can know cost price production for the Stone diagonal paving of Rp 20.290, Stone bishop paving of Rp 23.188, Stone block grass paving of Rp 19.589, and got by break even point pursuant to result of research that is : Stone diagonal paving 25.403, Stone bishop paving 13.965, Stone block grass paving 10.052. Got from result of calculation that selling price from compared to lower research of selling price standard industrialist. So that pursuant to result of simulation in selling price determining for the product of this stone paving, better utilize industrialist profit range from result of research.
Tidak tersedia versi lain