Potential hazard is something that has the potential for an incident to result in losses. Meanwhile, Risk is a combination of the consequences of a dangerous event and the chance of the event occurring. The purpose of this research is to identify the three greatest potential hazards that can occur and can cause losses by using the Failure Mode and Effect Analysis (FMEA) method and the proposed …